D11 |
Project management guidelines |
1 |
R |
PU |
2 |
D12 |
Periodic reports 1, 2, 3 |
1 |
R |
PU |
12,24,36 |
D13 |
Final report |
1 |
R |
PU |
38 |
D21.1 |
Tether factory (100 m) |
21 |
R |
PU |
14 |
D21.2 |
Tether factory (1 km) requirements |
21 |
R |
PU |
18 |
D21.3 |
Tether factory (1 km) |
21 |
R |
PU |
32 |
D22.1 |
Tether coating report |
22 |
R |
PU |
17 |
D23.1 |
Tether space environment requirements |
23 |
R |
PU |
8 |
D23.2 |
Tether vacuum-testing setup |
23 |
R |
PU |
12 |
D23.3 |
Tether vacuum-testing results |
23 |
R |
PU |
26 |
D24.1 |
Auxiliary tether report |
24 |
R |
PU |
16 |
D31.1 |
Requirements specs of the tether test reels |
31 |
R |
PU |
6 |
D31.2 |
Reeling test plan |
31 |
R |
PU |
6 |
D31.3 |
Reeling test results |
31 |
R |
PU |
9 |
D31.3 |
Reeling test results (First Amendment) |
31 |
R |
PU |
9 |
D32.1 |
Requirements specs of main tether reel |
32 |
R |
PU |
7 |
D32.2 |
Design description of main tether reel |
32 |
R |
PU |
11 |
D32.3 |
Main tether reel test plan |
32 |
R |
PU |
18 |
D32.4 |
Main tether reel test results |
32 |
R |
PU |
30 |
D33.1 |
Requirements specs of auxiliary tether reel |
33 |
R |
PU |
7 |
D33.2 |
Design description of auxiliary tether reel |
33 |
R |
PU |
11 |
D33.3 |
Auxiliary tether reel test plan |
33 |
R |
PU |
18 |
D33.4 |
Auxiliary tether reel test results |
33 |
R |
PU |
30 |
D41 |
Requirements specifications of Remote Unit |
41 |
R |
PU |
7 |
D41.2 |
Design description of Remote Unit |
41 |
R |
PU |
13 |
D41.3 |
Remote Unit test plan |
41 |
R |
PU |
20 |
D41.4 |
Remote Unit test results |
41 |
R |
PU |
32 |
D42.1 |
Final report of Remote Unit power system |
42 |
R |
PU |
30 |
D43.1 |
Final report of Remote Unit control and telemetry |
43 |
R |
PU |
30 |
D44.1 |
Final report of Remote Unit tether jettison |
44 |
R |
PU |
30 |
D45.1 |
Final report of Remote Unit gas thruster |
45 |
R |
PU |
30 |
D46.1 |
Simplified FEEP design report |
46 |
R |
CO |
18 |
D46.2 |
Simplified FEEP test report |
46 |
R |
PU |
30 |
D46.3 |
FEEP cost assessment for industrial prod. |
46 |
R |
PU |
30 |
D51.1 |
Simulator user guide |
51 |
R |
PU |
30 |
D51.2 |
Report of performed runs |
51 |
R |
PU |
36 |
D52.1 |
Conceptual E-sail designs |
52 |
R |
PU |
3 |
D53.1 |
Failure mode and recovery strategy analysis |
53 |
R |
PU |
26 |
D53.2 |
Refined design concepts |
53 |
R |
PU |
32 |
D61.1 |
E-sail mission document |
61 |
R |
PU |
36 |
D62.1 |
Orbit calculations supporting WP 6.1 |
62 |
O |
PP |
24-36 |
D81 |
Public and media outreach summary |
81 |
R |
PU |
36 |